SolarStart
System Normal
Kigoma Pilot · Tanzania · Online
Energy Flow Solar → Battery → Load
Solar ArrayGenerating
BatteryCharging
LoadActive
Generation
1.8kW
↑ +12% vs yesterday
Usage
1.2kW
3/4 loads online
Battery
76%
8.2h remaining
Available surplus
3.4kWh
usable today
AI Tips SolarStart-PdM v3
Clean solar panelsSoiling on Array A · efficiency −9%
Tomorrow partly cloudyPredicted 9.8 kWh — run heavy loads at midday
Battery SOH 87%Evaluate replacement within 12 months
Today Sep 26, 2026
12.6
Generated kWh
8.4
Used kWh
5.2
Est. Remaining
Battery 76%Self-sufficient 104%
2 alerts pendingLow battery voltage · PV offline
Solar Generation Power curve
Peak 2.1 kW12.6 kWh today
Battery SOC Charge level
High 82% · Low 41%Avg 64%
Load Usage Power curve
Peak 1.6 kWEvening peak 19:00-22:00
Surplus Energy Exported kWh
Peak 2.4 kWh4.2 kWh surplus today
Running Equipment
Solar Array A SoilingEfficiency −9% · 42°C · 1.8 kW
Battery RunningSOC 76% · SOH 87% · 31°C
Edge Gateway OnlineEdge EMS v2.4.1 · AI Model v3
Load Control Controllable loads only
Garden Light60W · Smart schedule
Water Pump320W · Manual control
WiFi Router12W · Always on
Inverter and battery main circuits are configured by the operations team. Users can only view status and control permitted loads.
If connectivity is lost, data is stored locally and synced on reconnection (store-and-forward).
Low battery voltage

SOC has dropped to 21%. Reduce non-essential loads to avoid deep discharge affecting battery life.

High View tips →
PV communication lost

Array A has not uploaded data for 30 minutes. Check wiring and gateway. Cloud AI switched to backup channel.

Medium Details →
Temperature back to normal

Battery temperature returned to a safe range. System resumed normal charging strategy automatically.

Resolved
Low-load protection completed

Low-load protection was active during cloudy days, keeping battery above 30% reserve.

Resolved

Need human support?

© 2026 Team THU 12 · SolarStart · ITC Competition
Site Info
SiteKigoma Pilot · Tanzania
VillageKigoma · Tanzania
Capacity5.2 kWp PV · 13.5 kWh
Fleet1 / 52 sites managed
PAYG & Credit
Prepaid balance$4.20
Credit score86 / 100
ArrearsNone
My Work Orders
P1Inverter repairResolved
P2Panel cleaningIn progress
About
SolarStart Mobile v2.0 · ITC THU 12 · © 2026